Concrete Slab Calculator · Free calculator

40x60 Concrete Slab Calculator

A 40' × 60' slab covers 2400 sq ft. At 4" thick that's 32.59 cubic yards of concrete with 10% waste — order 32.75 yd³ of ready-mix or 1467 × 80 lb bags. Garage and RV pads at 6" need 48.89 yd³. Rebar, forms and base are worked out below.

Quick answer

4" slab (patio / shed)
32.59 yd³
80 lb bags @ 4"
1,467
6" slab (garage / RV)
48.89 yd³
Rebar #4 @ 18" OC
176 × 20' sticks
2x4 forms
14 × 16' boards
Est. cost @ 4" (ready-mix)
$5,404

▍Concrete Calculator

ft
in
ft
in
in
Waste Factor
$
L = 60' 0"W = 40' 0"D = 4"
Cubic Yards
32.59yd³
incl. 10% waste · Ready-mix truck: order 32.75 yd³
Cubic Feet
880.00ft³
Area
2,400.0sq ft
Weight
66.00tons
Weight
132,000lbs
Concrete bags needed
  • 80 lb bag (0.6 ft³ yield)1,467
  • 60 lb bag (0.45 ft³ yield)1,956
  • 40 lb bag (0.3 ft³ yield)2,934

Concrete for a 40x60 slab by thickness

2400 sq ft, 10% waste included. Ready-mix ~$165/yd³ ordered in ¼ yd steps; 80 lb bags ~$6.50.

ThicknessTypical useCubic yardsOrder80 lb bags60 lb bagsWeightReady-mix80 lb bags $
4"Patio / Shed / Walkway32.59 yd³32.75 yd³1,4671,95666.00 tons$5,404$9,536
5"Driveway / Hot tub pad40.74 yd³40.75 yd³1,8342,44582.50 tons$6,724$11,921
6"Garage / RV Pad48.89 yd³49.00 yd³2,2002,93499.00 tons$8,085$14,300

Rebar grid for a 40x60 slab — 18" on center both ways

3" edge cover, 94 lap splices at 20" (40 bar diameters for #4), 5% cut-off waste.

ItemQuantityNotes
Bars running the 60' way27 bars59' 6" each
Bars running the 40' way40 bars39' 6" each
Total rebar3,343 LFincl. laps
20 ft sticks to buy176+5% cut-off waste
Weight #3 / #41,257 / 2,233 lbs0.376 / 0.668 lb per ft
Wire ties1,080one per intersection
Rebar chairs (2"–3")280~36" grid
Alt: 6x6 welded wire mesh58 sheets5' × 10' sheets, 6" laps

Forms & site prep for 40x60

ItemQuantityNotes
Form perimeter200 LF2 × (40' + 60')
2x4 form boards (16 ft)14use 2x6 for 5"–6" slabs
Wood stakes (18"–24")72every 3 ft + each corner
Duplex nails1442 per stake
Gravel base 4" (compacted)34.07 yd³ / 47.70 tons+15% for compaction
6-mil vapor barrier2,640 sq ft+10% for laps
Control joints380 LF8 cuts, panels ≤ 10'

How the math works

  1. Area: 60 ft × 40 ft = 2400 sq ft
  2. Thickness in feet: 4" ÷ 12 = 0.333 ft
  3. Volume: 2400 × 0.333 = 800.00 cu ft
  4. Add 10% waste: 800.00 × 1.10 = 880.00 cu ft
  5. Cubic yards: 880.00 ÷ 27 = 32.59 yd³ → order 32.75 yd³
  6. 80 lb bags: 880.00 ÷ 0.60 = 1467 bags (60 lb: ÷ 0.45 = 1956)
  7. Rebar: 27 bars × 59' 6" + 40 bars × 39' 6" = 3,343 LF → 176 sticks

Bag yields: 80 lb ≈ 0.60 cu ft, 60 lb ≈ 0.45 cu ft, 40 lb ≈ 0.30 cu ft (Quikrete / Sakrete). 1 yd³ = 45 × 80 lb bags.

Trade pro tips

  • 32.75 yd³ is more than one 10-yd truck — schedule trucks 30–45 minutes apart to avoid cold joints.
  • Order 5–10% extra. Subgrade is never perfectly flat, and running short mid-pour leaves a cold joint.
  • Compact 4" of gravel base and slope the forms ¼" per foot away from any structure.
  • Chair the rebar so it sits in the middle third of the slab — rebar lying on the dirt does nothing.
  • Cut control joints ¼ of the slab depth, no more than 2–3 × the thickness (in feet) apart, within 6–18 hours.

Frequently asked questions

How many yards of concrete do I need for a 40x60 slab?

With 10% waste: 4" thick = 32.59 yd³ (order 32.75), 5" = 40.74 yd³ (order 40.75), 6" = 48.89 yd³ (order 49.00). A 40x60 slab is 2400 sq ft.

How many 80 lb bags of concrete for a 40x60 slab 4 inches thick?

1467 bags of 80 lb concrete (0.60 cu ft each) or 1956 bags of 60 lb, including 10% waste. That is about 117,360 lbs of bags to haul.

How much rebar do I need for a 40x60 slab?

A grid at 18" on center both ways uses 27 bars running 60 ft and 40 bars running 40 ft — about 3,343 linear feet, or 176 twenty-foot sticks of #3 or #4 rebar, 1,080 ties and ~280 chairs.

How much does a 40x60 concrete slab cost?

Material only at 4": about $5,404 in ready-mix or $9,536 in 80 lb bags; at 6": about $8,085 ready-mix. Installed, 40x60 slabs typically run $6–$12 per sq ft ($14,400–$28,800) depending on region, access and finish.