How the math works
Area: 8 ft × 8 ft = 64 sq ftThickness in feet: 4" ÷ 12 = 0.333 ftVolume: 64 × 0.333 = 21.33 cu ftAdd 10% waste: 21.33 × 1.10 = 23.47 cu ftCubic yards: 23.47 ÷ 27 = 0.87 yd³ → order 1.00 yd³80 lb bags: 23.47 ÷ 0.60 = 40 bags (60 lb: ÷ 0.45 = 53)Rebar: 6 bars × 7' 6" + 6 bars × 7' 6" = 90 LF → 5 sticks
Bag yields: 80 lb ≈ 0.60 cu ft, 60 lb ≈ 0.45 cu ft, 40 lb ≈ 0.30 cu ft (Quikrete / Sakrete). 1 yd³ = 45 × 80 lb bags.
Trade pro tips
- At 0.87 yd³ this 8x8 pour is bag territory — rent a mixer and have a crew of 2–3 ready.
- Order 5–10% extra. Subgrade is never perfectly flat, and running short mid-pour leaves a cold joint.
- Compact 4" of gravel base and slope the forms ¼" per foot away from any structure.
- Chair the rebar so it sits in the middle third of the slab — rebar lying on the dirt does nothing.
- Cut control joints ¼ of the slab depth, no more than 2–3 × the thickness (in feet) apart, within 6–18 hours.
Frequently asked questions
How many yards of concrete do I need for a 8x8 slab?
With 10% waste: 4" thick = 0.87 yd³ (order 1.00), 5" = 1.09 yd³ (order 1.25), 6" = 1.30 yd³ (order 1.50). A 8x8 slab is 64 sq ft.
How many 80 lb bags of concrete for a 8x8 slab 4 inches thick?
40 bags of 80 lb concrete (0.60 cu ft each) or 53 bags of 60 lb, including 10% waste. That is about 3,200 lbs of bags to haul.
How much rebar do I need for a 8x8 slab?
A grid at 18" on center both ways uses 6 bars running 8 ft and 6 bars running 8 ft — about 90 linear feet, or 5 twenty-foot sticks of #3 or #4 rebar, 36 ties and ~9 chairs.
How much does a 8x8 concrete slab cost?
Material only at 4": about $165 in ready-mix or $260 in 80 lb bags; at 6": about $248 ready-mix. Installed, 8x8 slabs typically run $6–$12 per sq ft ($384–$768) depending on region, access and finish.