How the math works
Area: 16 ft × 12 ft = 192 sq ftVolume @ 4": 192 × (4 ÷ 12) = 64.00 cu ftAdd 10%: 64.00 × 1.10 = 70.40 cu ftCubic yards: 70.40 ÷ 27 = 2.61 yd³Tons: 2.61 × 1.4 = 3.65 tonsTruck loads: 9.13 tons ÷ 15 tons per tandem = 1
Trade pro tips
- At 4" deep, 12x16 takes 3.65 tons — a single dump truck delivery covers it.
- Build in layers: 4" of #3 (2"–3") stone, 4" of #57, then 2" of crusher run / dense grade on top.
- Lay non-woven geotextile over clay soil first — it stops stone from sinking.
- Crown the driveway ½" per foot so water sheds to the sides.
- Spread with a box blade and compact each layer before the next.
Frequently asked questions
How many tons of gravel do I need for a 12x16 driveway?
At 4" deep: 3.65 tons. At 6": 5.48 tons. A complete 3-layer driveway (4" #3 + 4" #57 + 2" crusher run) is 9.13 tons. All include 10% extra.
How many cubic yards of gravel for 12x16?
2": 1.30 yd³; 4": 2.61 yd³; 6": 3.91 yd³; 8": 5.21 yd³. 12x16 is 192 sq ft.
How many truck loads of gravel for a 12x16 driveway?
A tandem dump truck carries about 15 tons. 12x16 at 4" (3.65 t) is 1 load; the full 3-layer build (9.13 t) is 1 load.
How much does a 12x16 gravel driveway cost?
Stone alone at 4" is about $151 (~$55/yd³). A 3-layer build runs roughly $359 in material plus 24 sq yd of fabric; delivery and grading are extra.