How the math works
Area: 24 ft × 24 ft = 576 sq ftVolume @ 4": 576 × (4 ÷ 12) = 192.00 cu ftAdd 10%: 192.00 × 1.10 = 211.20 cu ftCubic yards: 211.20 ÷ 27 = 7.82 yd³Tons: 7.82 × 1.4 = 10.95 tonsTruck loads: 27.38 tons ÷ 15 tons per tandem = 2
Trade pro tips
- At 4" deep, 24x24 takes 10.95 tons — a single dump truck delivery covers it.
- Build in layers: 4" of #3 (2"–3") stone, 4" of #57, then 2" of crusher run / dense grade on top.
- Lay non-woven geotextile over clay soil first — it stops stone from sinking.
- Crown the driveway ½" per foot so water sheds to the sides.
- Spread with a box blade and compact each layer before the next.
Frequently asked questions
How many tons of gravel do I need for a 24x24 driveway?
At 4" deep: 10.95 tons. At 6": 16.43 tons. A complete 3-layer driveway (4" #3 + 4" #57 + 2" crusher run) is 27.38 tons. All include 10% extra.
How many cubic yards of gravel for 24x24?
2": 3.91 yd³; 4": 7.82 yd³; 6": 11.73 yd³; 8": 15.64 yd³. 24x24 is 576 sq ft.
How many truck loads of gravel for a 24x24 driveway?
A tandem dump truck carries about 15 tons. 24x24 at 4" (10.95 t) is 1 load; the full 3-layer build (27.38 t) is 2 loads.
How much does a 24x24 gravel driveway cost?
Stone alone at 4" is about $440 (~$55/yd³). A 3-layer build runs roughly $1,076 in material plus 71 sq yd of fabric; delivery and grading are extra.