How the math works
Area: 30 ft × 24 ft = 720 sq ftVolume @ 4": 720 × (4 ÷ 12) = 240.00 cu ftAdd 10%: 240.00 × 1.10 = 264.00 cu ftCubic yards: 264.00 ÷ 27 = 9.78 yd³Tons: 9.78 × 1.4 = 13.69 tonsTruck loads: 34.22 tons ÷ 15 tons per tandem = 3
Trade pro tips
- At 4" deep, 24x30 takes 13.69 tons — a single dump truck delivery covers it.
- Build in layers: 4" of #3 (2"–3") stone, 4" of #57, then 2" of crusher run / dense grade on top.
- Lay non-woven geotextile over clay soil first — it stops stone from sinking.
- Crown the driveway ½" per foot so water sheds to the sides.
- Spread with a box blade and compact each layer before the next.
Frequently asked questions
How many tons of gravel do I need for a 24x30 driveway?
At 4" deep: 13.69 tons. At 6": 20.53 tons. A complete 3-layer driveway (4" #3 + 4" #57 + 2" crusher run) is 34.22 tons. All include 10% extra.
How many cubic yards of gravel for 24x30?
2": 4.89 yd³; 4": 9.78 yd³; 6": 14.67 yd³; 8": 19.56 yd³. 24x30 is 720 sq ft.
How many truck loads of gravel for a 24x30 driveway?
A tandem dump truck carries about 15 tons. 24x30 at 4" (13.69 t) is 1 load; the full 3-layer build (34.22 t) is 3 loads.
How much does a 24x30 gravel driveway cost?
Stone alone at 4" is about $550 (~$55/yd³). A 3-layer build runs roughly $1,344 in material plus 89 sq yd of fabric; delivery and grading are extra.